Recently, the Andhra Pradesh State Cabinet approved the construction of a flood protection wall along the Krishna River. This initiative aims to mitigate recurring flooding issues affecting local communities. The decision follows previous efforts to address soil erosion and flooding on the river’s banks, particularly in Vijayawada and surrounding areas.
Krishna River System
Tributaries of Krisha River
Drought and Flood Prone Areas:
Major Projects
- Tungabhadra Project: Hydroelectricity, irrigation, and flood control.
- Srisailam Project: Large dam with the Srisailam Sagar reservoir.
- Nagarjuna Sagar Dam: Crosses the borders of Nalgonda and Guntur districts.
- Prakasam Barrage: Conceptualized by Major Cotton, built near Vijayawada.
- Bhima Project: Across the Bhima River in Solapur district.
Flood Protection Wall
A flood protection wall will be built from 0.9 km to 2.61 km downstream of the Prakasam Barrage. The project is located in Tadepalli village, Guntur district. The estimated cost is ₹294.20 crore. This wall aims to protect Sundarayya Nagar and Mahanadu Colony from future floods.
Mini Hydel Plants Approval
The Cabinet approved the establishment of two mini hydel plants by M/s May Encans (P) Limited. One will have a capacity of 1 MW, and the other will be 2.7 MW. Both plants will be located near the Sardar Gouthu Latchanna Thotapalli Barrage on the Nagavali River.
Leave a Reply